Completed, 2024
Feeder road rehabilitation
Gbarnga district, Bong County
38 km of laterite road re-graded and re-gravelled, 22 culverts, side drains throughout
Client: Development partner programme
Riverstone is a Monrovia-based civil engineering and building contractor. We survey, test the soil, design and build, from feeder roads in Bong to office blocks in Sinkor.
Riverstone Engineering & Construction Inc.
Registered with the Liberia Business Registry and the Ministry of Public Works
Most of our work is outside the building line: the roads, crossings, drains and water systems that towns and concessions depend on. Open any line to see what it covers.
The same engineers and the same concrete testing go into our buildings, from a family home to a five-storey frame.
Our site lab tests soils and concrete on every contract, and we own the plant to move earth in volume. That means estimates built on measured ground, and no waiting on hired equipment when the dry season opens.
California Bearing Ratio (CBR)
Sets pavement thickness from the strength of the actual subgrade.
Proctor compaction and field density
Proves every fill layer reached specified density before the next goes on.
Atterberg limits and grading
Tells good laterite from material that turns to mud in July.
Concrete slump and cube crushing
Each pour sampled and crushed at 7 and 28 days, with results shared with you.
| Item | Units | Used for |
|---|---|---|
| Motor graders | 4 | Road formation and re-gravelling |
| Excavators (20–30 t) | 6 | Bulk earthworks, drains, river works |
| Vibratory rollers | 5 | Subgrade and base compaction |
| Wheel loaders | 3 | Borrow pits and stockpiles |
| Tipper trucks | 18 | Laterite, aggregate and spoil haulage |
| Concrete batching plant, 30 m³/h | 1 | Bridges, drains and frames |
| Transit mixers | 4 | Ready-mix delivery to site |
| Water bowsers | 3 | Compaction moisture and dust control |
| GNSS and total station kits | 3 | Survey and setting out |
A cross-section of work for ministries, development partners, concession operators and private clients.
Completed, 2024
Gbarnga district, Bong County
38 km of laterite road re-graded and re-gravelled, 22 culverts, side drains throughout
Client: Development partner programme
Completed, 2025
District 4, Grand Bassa County
45 m reinforced concrete bridge replacing a failed timber crossing, with 400 m of approach road
Client: Ministry of Public Works
In progress, 2026
Paynesville, Montserrado County
4.2 km of covered concrete drains and two outfalls in a neighbourhood that flooded every rainy season
Client: City corporation
Completed, 2023
Atlantic coast, Montserrado County
600 m of rock armour revetment protecting homes, a school and the coastal road
Client: Coastal resilience project
Completed, 2024
Buchanan, Grand Bassa County
12 boreholes, 8 km of distribution pipeline and a 200 m³ elevated tank
Client: International NGO
Completed, 2025
Yekepa road, Nimba County
2,400 m² steel portal-frame warehouse, heavy-duty slab and 60-bed staff camp
Client: Mining operator
In progress, 2026
Sinkor, Monrovia, Montserrado County
3,200 m² reinforced concrete frame office block with basement parking and solar backup
Client: Private developer
Monrovia gets over 5,100 mm of rain a year, and almost all of it falls between May and October. Laterite turns to mud and rivers rise several metres. We sequence work so the earth moves in the dry months and the roof is on before June.
| Jan | 31 mm, dry season |
|---|---|
| Feb | 56 mm, dry season |
| Mar | 97 mm, dry season |
| Apr | 216 mm, dry season |
| May | 516 mm, rainy season |
| Jun | 973 mm, rainy season |
| Jul | 996 mm, rainy season |
| Aug | 373 mm, rainy season |
| Sep | 744 mm, rainy season |
| Oct | 772 mm, rainy season |
| Nov | 236 mm, dry season |
| Dec | 130 mm, dry season |
An engineer walks the site, takes levels and soil samples, and listens to what you need.
Drawings and a fully itemised price, based on the test results rather than guesswork.
A written contract, a programme planned around the season, and plant moved to site.
Test results, photos and spending against budget every week, with site meetings on request.
As-built drawings at handover, and we return to fix any defect that shows in the first year.
Many of our residential clients are in the US, Europe and across West Africa. You should not have to fly home to know your money is in the walls.
Weekly site report, week 14
4-bedroom house, Marshall
Example of a weekly report sent to a client abroad.
Our plant moves by low-bed from Monrovia and Gbarnga. For remote sites in the southeast we set up a camp and a local materials yard, and we hire and train in the community.
We reply to every request within two working days, and site visits in Montserrado and Margibi are free.